Enterprise network, servers, storage and cybersecurity.Enterprise ICT. Request a quote →

Side by Side
Side by Side

Energy Which systems go offline first?

Halliburton, August 2024: parts of its business applications disrupted.¹ We supply and integrate network, servers, storage and security.

Energy Which systems go offline first?

Halliburton, August 2024: parts of its business applications disrupted.¹ We supply and integrate network, servers, storage and security.

Energy Which systems go offline first?

Halliburton, August 2024: parts of its business applications disrupted.¹ We supply and integrate network, servers, storage and security.

Energy Which systems go offline first?

Halliburton, August 2024: parts of its business applications disrupted.¹ We supply and integrate network, servers, storage and security.

Every remote way in. Counted before you buy.

We write into your requirement: no site can be reached from the internet without a second sign-in step, and no two sites share a password. We check every remote way in and any factory passwords, then supply and install the firewalls.

Documents

Open the design behind each rule.

Strategic Resourcing Blueprint

Automation Blueprint

Security Blueprint

Implementation Services Blueprint

Write the shut-off list before the attack.

Halliburton, August 2024: disruptions and limited access to parts of its business applications.¹ We write into your requirement: which systems go offline first, and what the field can still do.

  1. What we check before you buy: your shut-off list, and what keeps running during it.
  2. A difference from intended configuration is reported within 15 minutes.²
  3. Every device configuration is rendered from one version-controlled source.³

Written by Winston, Morgan, Phillips and Dhinakaran.

Two rule sets,
side by side.

NERC CIP-010-4 binds Bulk Electric System entities in the US and Canada⁵; US date for CIP-010-5: Jul 1, 2028.³ TSA Security Directive Pipeline-2021-02G binds designated US pipeline owners and operators, in force May 3, 2026 to May 2, 2027.⁶

Our designNERC CIP-010-4TSA SD Pipeline-2021-02G
Every change recorded, with author and reviewer³
Unplanned changes found within 15 minutes²
One version-controlled configuration source³
OT keeps running with every IT link cut⁷
Covered by Automation
Covered by Implementation Services
Covered by Security

We supply Cisco, Palo Alto Networks and Check Point. We still count your ways in, one by one.

01

Talk to an expert

About your requirement, with an engineer.

02

Request a quote

Send what you need to buy and by when. You get a reply the same day, then a quote.⁸

03

All design studies

Open to read, each with its author named.

Compared. Then Delivered.

¹ Halliburton Form 8-K, August 2024; annual report for 2024.

² Automation Blueprint, item 7, a design target; design study “Configuration baselines for a generation fleet under NERC CIP-010”, item 9.

³ NERC CIP-010-4 and CIP-010-5 dates: Automation Blueprint, section 9.1. Design numbers: Automation Blueprint items 3, 7 and 13; Implementation Services Blueprint item 8.

⁴ Strategic Resourcing Blueprint, items 2 to 4, 10 and 12.

⁵ Naming a rule is not a claim of compliance: your assessor decides, and Symbeeo holds no such certification or authorization.

⁶ Security Blueprint, section 9.3, items 4 and 12; design study “Pipeline OT that keeps running with IT cut off”, items 2 and 15. Source: TSA, Security Directives and Emergency Amendments, https://www.tsa.gov/sd-and-ea.

⁷ Design study “Pipeline OT that keeps running with IT cut off”, item 4: at least 72 hours, tested twice a year; a design target.

⁸ We earn when you buy through us.

The cases named above are public record, not our clients. The lines we write are our reading, not the source’s.