Enterprise network, servers, storage and cybersecurity.Enterprise ICT. Request a quote →

Side by Side
Side by Side

Cloud

Private links to AWS, Azure or Google Cloud, and a tested way out: supplied and integrated.

Request a quote

Cloud

Private links to AWS, Azure or Google Cloud, and a tested way out: supplied and integrated.

Request a quote

Hybrid and multi-cloud foundation

A migration or a cloud renewal? We integrate the links and the way out.

We design, supply, integrate and support private links, one sign-in and one set of controls across AWS, Azure or Google Cloud, with Equinix and Akamai where they fit. We write an exit before you sign: one workload exported and restored, time and cost recorded.¹

Cloud Blueprint: two facilities, dedicated ports to each cloud.

  • 01

    30 days to export your data

    A workload’s data is exported and restored. Pass: within 30 days, record kept.⁵

  • 02

    3 seconds to the surviving path

    Traffic is designed to move to the surviving path in 3 seconds or less.³

  • 03

    Checked every 24 hours

    Every 24 hours the live setup is compared with the code.³

Public cloud storage is refused.⁴

What we supply.

Private, encrypted links from both sites to AWS, Azure or Google Cloud, and one sign-in across all of them.²

A data center building beside a lake

  • Yes: one shape in every cloud, built from code.
  • Guardrails first. Region limits, no public storage and encryption are in force before an account’s first workload.
  • Checked daily. Every 24 hours the live setup is compared with the code.

Led by Steve Phillips

One circuit cut

A circuit is cut. Pass: traffic on the surviving path within 3 seconds.⁵

15 minutes at most

The most data a recovery may lose.⁵

Running within 4 hours

From failure to the workload running again.⁵

10 Gbps committed

At least 10 Gbps committed per site per cloud.³

23 tests

Each test has a written pass mark.⁵

For the head of infrastructure who must prove to board and regulator that every account sits under one set of controls.

Providers serving the EU can be left on the Data Act’s terms.

Every workload placed by its score: cost, latency, residency, exit.

Written by Steve Phillips, Principal Data Center Architect.

Design studies

Our cloud design studies

Questions about this design? You get a reply the same day.

A data center building

Send what you need to buy and by when. You get a reply the same day, then a quote.

Questions about this design? You get a reply the same day.

A data center building

Send what you need to buy and by when. You get a reply the same day, then a quote.

Compared. Then Delivered.

¹ Cloud Blueprint, item 15.

² Cloud Blueprint.

³ Cloud Design.

⁴ Cloud Test Plan, T3.

⁵ Cloud Test Plan.

⁷ Competition and Markets Authority, summary of final decision, July 31, 2025.

⁸ OVHcloud, Strasbourg datacentre: latest information, update of April 23, 2021.

The cases named above are public record, not our clients. The lines we write are our reading, not the source’s.